Alok was leading in polyester texturising plant at VAPI
Operation & Maintenance of 3.5 & 3.0 MW Captive Power Plant with ROCKWELL make SCADA operating System
3.5 MW & 3.0 MW Triveni make Extraction cum Condensing Steam Turbine & Auxiliary’s
27 TPH Thermax Make AFBC High Pressure Boiler & Auxiliary’s
30 TPH Forbes Vanky make incliant Stoker fire high pressure boiler& Auxiliarys
35 X 02 Thermax make AFBC Process Steam Boiler with ROCKWELL make SCADA operating System
60 lacks K Cal X 02 Thermax make AFBC Thermic Fluid Heaters with ROCKWELL make SCADA operating System
30 lacks K Cal Thermax make AFBC Thermic Fluid Heater with ROCKWELL make SCADA operating System
BAVCON make Coal Handelling Plant
R O Palant & D M Plant